Open Collaboration Brief·Location: Bajío Region / Querétaro, Mexico · Rolling Evaluation · Target Q3 2026
Semi-Arid Soil Moisture & Aquifer Extraction Optimization
Validating multi-depth capacitance soil moisture probes and telemetry gateways to curtail over-irrigation and monitor groundwater extraction in water-stressed high-value horticulture.
Collaboration Parameters
Target CollaboratorCommercial Agrifood Producer or Agronomic Research Institute
Current StageExpression of Interest (EOI)

01 Problem to Explore
The Operational Friction & Hypothesis.
Groundwater aquifers across central Mexico are severely overdrawn, leading to deepening well depths, escalating pumping electricity costs, and rising water salinity. Commercial producers need precise root-zone moisture metrics to transition from precautionary calendar-based watering to demand-driven deficit irrigation without risking yield quality.
02 Participation Requirements
What We Look For in Candidate Partners.
- 01Commercial production of high-value crops (broccoli, berries, or protected vegetables) with active drip irrigation.
- 02Existing flow meters or electrical sub-meters on primary irrigation pump stations.
- 03Access for our agronomy team to install 6 multi-depth probe stations across representative soil zones.
✓ What Is Known Today
- ·Drip irrigation infrastructure is already installed on-site, but scheduling is predominantly timer-based.
- ·Well water electrical conductivity (EC) rises significantly toward the end of the dry season.
- ·Cellular LTE coverage is stable across the intended trial farm perimeter.
What Remains Unknown
- ·The exact water stress threshold before commercial quality grading (e.g. berry brix or head firmness) drops.
- ·Speed of local operator adaptation when moving away from traditional fixed pumping schedules.
- ·Long-term durability of probe seals in soils with elevated calcium carbonate levels.
Proposed Next Step
Conduct a virtual review of farm soil maps and irrigation schematics with the estate agronomist.
↳
